Signature Projects


The Golf Club at Newcastle
Newcastle, Washington

SEA CON LLC was the construction manager and general contractor on this world class PGA golf resort. Construction included: two (2) 18-hole golf courses, 70 station driving range, 18-hole putting course and a 750-seat amphitheater, allowing this Northwest destination location to shine. (View project documentation)


    


Issaquah Medical Building
Issaquah, Washington

A five story 55,000 sf hybrid steel building designed specifically for medical office use. The building included a second level post tensioned parking deck constructed within tight confines of an existing wetland area and abutting WSDOT easements. (View project documentation)



Redhook Ale Breweries
Portsmouth, New Hampshire and Seattle & Woodinville Washington

Multiple projects, each in excess of 135,000 sf. These hybrid pre-engineered metal buildings house fully automated, state of the art brewing facilities; including pub, restaurant, retail sales, and business meeting accommodations.

(View Woodinville project documentation)
(View Seattle project documentation)
(View New Hampshire project documentation)


     


Genie Terex
North Bend, Washington

A 24 acre project, with 200,000 sf of buildings built for Terex Aerial Lift Platforms. The project utilized complete ground water filtration and buildings designed and constructed to LEED Silver requirements. Construction included the building of a 43,000 sf pre-engineered steel cross dock building. (View project documentation)


South Park Industrial Terminal
Seattle, Washington

This property is approximately 19.4 acres of industrial land in Seattle’s South Park neighborhood. The property is located within the former South Park Landfill site. First phase of construction has started with completion expected December 2013.


Seattle Iron and Metal
Seattle, Washington

SEA CON LLC was retained by SIM to assist in the relocation negotiations with the Port of Seattle and as the Construction Manager/General Contractor. The $30 million dollar project's fast track schedule (8 Months) required that 10 buildings had to be constructed simultaneously on the confined site. (View project documentation)



    Privacy Policy  | 2013 SEA CON LLC  | All rights reserved